Today, 3 November 2025, DESNZ has published its response to its consultation on changes to a number of technical SEC Documents to incorporate VWAN related changes in advance of the 6 November SEC release.  The original consultation can be found here.

 

The following documents are being additionally incorporated into the SEC with effect from 6 November:

  • SEC Appendix AD ‘DCC User Interface Specification’ v5.4(draft)
  • SEC Appendix AF ‘Message Mapping Catalogue’ v5.4
  • SEC Schedule 8 ‘GB Companion Specification’ v 4.4(draft)
  • SEC Schedule 10 ‘Communication Hub Technical Specifications’ v1.7

 

DUIS and GBCS are being designated as draft versions because they will immediately be updated by SEC modifications which also form part of the 6 November SEC Release.

 

The following documents are being re-designated (also with effect from 6 November):

  • SEC Schedule 11 ‘TS Applicability Tables’ v25
  • SEC Appendix AZ ‘VWAN Transition Document’ v3.0

 

The response document (including Annexes 1 and 2) can be found here and the other annexes (which contain the documents referred to above) can be found here.

We have also today published letters regarding the live service criteria for Soft Launch sent to DCC and the SEC Panel. These letters can be found here.

Go Back

More News

6 Aug 2026

Central Products List (CPL) Version 3.082 now published

Version 3.082 of the CPL is now available on the SEC website for download. Change Summary 1 SMETS2 L+G GSME…
Read more
Sign Up to SEC Newsletter

By subscribing you consent to receiving the SEC newsletter.

Contact details provided will only be used to send the newsletter and not for any other purpose.

We use a tracking pixel to track engagements with our newsletter. This collects information on your device, the content you opened, and how many times you opened it. You can turn off this tracking by setting your email client to display emails as ‘text only’

The SEC newsletter will be sent bi-monthly and will provide information on SEC updates and events.