SECMP0013 Smart meter device diagnostics and triage

Proposer Tim Newton
Lead Analyst SEC Change
Date raised 04/05/2016
StageWithdrawn
Implementation date Unknown
Latest update Withdrawn by Proposer on 27 November 2020.

What is the issue?

The proposal seeks to amend the SEC and DCC’s systems to provide Suppliers with a means of performing quality assurance and fault diagnostics on SMETS2 devices returned by meter operatives.

What is the solution?

An alternative solution to the Preliminary Assessment has been devised outside of the SEC Modifications process. SECMP0013 may be used to facilitate this alternative solution when it come to fruition.

Modification documents

SECMP0013 Revised DCC Preliminary Assessment
11/06/2019
SECMP0010 and SECMP0013 Joint Working Group Meeting - Final Minutes (31.10.18)
13/11/2018
SECMP0010 and SECMP0013 - Joint Working Group Meeting - Final Minutes (24.09.18)
08/10/2018
SECMP0013 -Solution Design Document - v4.1
19/05/2017
SECMP0013 - Working Group Meeting 2 - Final Minutes
16/02/2017
SECMP0013 - Working Group Meeting 1 - Final Minutes
16/02/2017
SECMP0013 - Initial Modification Report
13/05/2016
SECMP0013 - Modification Proposal Form
06/05/2016
No files
No files
No files
No files
No files

If you believe there is a problem with this modification, please let us know HERE.