SEC Panel Elections 2022 – Outcomes
By Cecily Bain / 21 September 2022
23 September 2022 signals the end of term for those Panel Members serving a 24-month term. In July SECAS issued...
Read More
SEC Panel Elections – Update and call for Other SEC Party vote
By Cecily Bain / 30 August 2022
23 September 2022 signals the end of term for those Panel Members serving a 24-month term. In July SECAS issues...
Read More
SEC v63.0 released to implement MP209
By Bradley Baker / 1 August 2022
An updated version of the SEC came into effect on 1 August 2022 to implement MP209 'Lifetime CPA Certificates'. ...
Read More
BEIS Consultation on amending the replacement obligation for SMETS1 Devices not enrolled with DCC
By Harry Jones / 29 July 2022
On 29 July 2022, the Department for Business, Energy and Industrial Strategy (BEIS) issued a consultation on amending the replacement...
Read More
BSC P375: Metering Equipment ‘behind’ the Boundary Point to be used for Settlement purposes (SEC website login required to access)
By Adam Musgrave / 26 July 2022
BSC P375 will allow Metering Equipment ‘behind’ the Boundary Point to be used for Settlement purposes. The Modification aims to...
Read More
BEIS information on Supplier licence changes
By Adam Musgrave / 19 July 2022
On the 18 July 2022, changes to Energy Supplier licences were made. On 19 July 2022 these changes came into...
Read More
19 July 2022 Update on MOC (MDS) Requesting Party (RP) Decommissioning Timetable and Letter to the Secretary of State
By Adam Musgrave / 19 July 2022
The DCC wrote to the Secretary of State on 4 July 2022 to recommend that the Requesting Party for the...
Read More
Fifth Iteration of the TABASC Effectiveness Review Questionnaire – responses due by 5pm on 20 August 2022
By Adam Musgrave / 19 July 2022
Smart Energy Code (SEC) Section F1.4 (e – g) sets out the requirements for the Technical Architecture and Business Architecture...
Read More
SEC v62.0 released to implement MP200
By Mike Fenn / 18 July 2022
An updated version of the SEC came into effect on 18 July 2022 to implement MP200 ‘Faster Switching consequential changes...
Read More
MOC (MDS) Requesting Party (RP) Decommissioning Timetable and Letter to the Secretary of State
By Adam Musgrave / 5 July 2022
Following publication of the SMETS1 Conclusion – Initial Closure Matters, the DCC wrote to the Secretary of State on 4...
Read More