PPM Installation End Date

Has the meaning given to that expression in Section A3.14.

This section applies on the installation or provision by or on behalf of a Supplier Party of any
Replacement Meter and ancillary Device or apparatus where:
(a) the Energy Meter that is being replaced is not part of a Smart Metering System; and
(b) the Replacement Meter is, in accordance with the terms of a contract between the Supplier Party
and the Energy Consumer at the premises at which it is installed, to be operated as a Pre-Payment
Meter for at least an initial period from the date of its installation,
in which case the Installation End Date in respect of any Version of the SMETS with a Principal Version number
of 1 shall be the date which is identified

« Back to Glossary Index