Filename | TABASC_27_1502-Meeting-Headlines-v1.0.pdf |
Filesize | 126.71 KB |
Version | v1.0 |
Date added | 16 February 2018 |
Downloaded | 434 times |
Tags | TABASC |
Filename | TABASC_27_1502-Meeting-Headlines-v1.0.pdf |
Filesize | 126.71 KB |
Version | v1.0 |
Date added | 16 February 2018 |
Downloaded | 434 times |
Tags | TABASC |
This is the April 2024 SEC Modifications Working Group meeting, where we will be discussing: MP085B ‘Synchronisation of Smart Meter voltage measurement periods (meters currently installed)’ MP244 ‘Device Alerts
This is the April 2024 SEC Issues Group meeting, where we discussed: PPM continuity plan Please see the meeting summary here: SEC Issues Group Meeting Summary - April 2024 (CLEAR)
OPSG_115_0904 – Agenda (CLEAR) OPSG_115_0904 - Meeting Headlines (CLEAR)
This meeting has been cancelled. The next Change Board meeting will take place on Wednesday 22 May 2024.
By subscribing you consent to receiving the SECAS newsletter.