Filename | SECMP0007-Working-Group-Consultation-responses-v2.0.pdf |
Filesize | 253.44 KB |
Version | 2.0 Previous versions |
Date added | 17 May 2019 |
Downloaded | 887 times |
Category | Consultation, Modification Proposals |
Tags | Refinement Consultation |
Filename | SECMP0007-Working-Group-Consultation-responses-v2.0.pdf |
Filesize | 253.44 KB |
Version | 2.0 Previous versions
|
Date added | 17 May 2019 |
Downloaded | 887 times |
Category | Consultation, Modification Proposals |
Tags | Refinement Consultation |
This is the April 2024 SEC Modifications Working Group meeting, where we will be discussing: MP085B ‘Synchronisation of Smart Meter voltage measurement periods (meters currently installed)’ MP244 ‘Device Alerts
This is the April 2024 SEC Issues Group meeting, where we discussed: PPM continuity plan Please see the meeting summary here: SEC Issues Group Meeting Summary - April 2024 (CLEAR)
OPSG_115_0904 – Agenda (CLEAR) OPSG_115_0904 - Meeting Headlines (CLEAR)
This meeting has been cancelled. The next Change Board meeting will take place on Wednesday 22 May 2024.
By subscribing you consent to receiving the SECAS newsletter.