Filename | sec-section-x-transition-1-1.pdf |
Filesize | 637.37 KB |
Version | 1 Previous versions |
Date added | 1 November 2022 |
Downloaded | 2337 times |
Category | Guidance, SEC Documents, SEC Section Guidance |
Tags | Guidance |
sec_order | 160 |
Filename | sec-section-x-transition-1-1.pdf |
Filesize | 637.37 KB |
Version | 1 Previous versions
|
Date added | 1 November 2022 |
Downloaded | 2337 times |
Category | Guidance, SEC Documents, SEC Section Guidance |
Tags | Guidance |
sec_order | 160 |
This is the April 2024 SEC Modifications Working Group meeting, where we will be discussing: MP085B ‘Synchronisation of Smart Meter voltage measurement periods (meters currently installed)’ MP244 ‘Device Alerts
This is the April 2024 SEC Issues Group meeting, where we discussed: PPM continuity plan Please see the meeting summary here: SEC Issues Group Meeting Summary - April 2024 (CLEAR)
OPSG_115_0904 – Agenda (CLEAR) OPSG_115_0904 - Meeting Headlines (CLEAR)
This meeting has been cancelled. The next Change Board meeting will take place on Wednesday 22 May 2024.
By subscribing you consent to receiving the SECAS newsletter.