Filename | Parse-and-Correlate-Applicability-Matrix-v3.0.pdf |
Filesize | 134.12 KB |
Version | 3.0 Previous versions |
Date added | 4 November 2022 |
Downloaded | 3842 times |
Category | Code Required Documents, SEC Documents |
Tags | Parse and Correlate |
Filename | Parse-and-Correlate-Applicability-Matrix-v3.0.pdf |
Filesize | 134.12 KB |
Version | 3.0 Previous versions
|
Date added | 4 November 2022 |
Downloaded | 3842 times |
Category | Code Required Documents, SEC Documents |
Tags | Parse and Correlate |
This is the April 2024 SEC Modifications Working Group meeting, where we will be discussing: MP085B ‘Synchronisation of Smart Meter voltage measurement periods (meters currently installed)’ MP244 ‘Device Alerts
This is the April 2024 SEC Issues Group meeting, where we discussed: PPM continuity plan Please see the meeting summary here: SEC Issues Group Meeting Summary - April 2024 (CLEAR)
OPSG_115_0904 – Agenda (CLEAR) OPSG_115_0904 - Meeting Headlines (CLEAR)
This meeting has been cancelled. The next Change Board meeting will take place on Wednesday 22 May 2024.
By subscribing you consent to receiving the SECAS newsletter.