Filename | Migration-Testing-Approach-Document-for-SMETS1-Services-MTAD-v4.0-clean.pdf |
Filesize | 431.92 KB |
Version | 4.0 Previous versions |
Date added | 27 January 2023 |
Downloaded | 2660 times |
Category | Code Required Documents, The Developing SEC |
Filename | Migration-Testing-Approach-Document-for-SMETS1-Services-MTAD-v4.0-clean.pdf |
Filesize | 431.92 KB |
Version | 4.0 Previous versions
|
Date added | 27 January 2023 |
Downloaded | 2660 times |
Category | Code Required Documents, The Developing SEC |
This is the April 2024 SEC Modifications Working Group meeting, where we will be discussing: MP085B ‘Synchronisation of Smart Meter voltage measurement periods (meters currently installed)’ MP244 ‘Device Alerts
This is the April 2024 SEC Issues Group meeting, where we discussed: PPM continuity plan Please see the meeting summary here: SEC Issues Group Meeting Summary - April 2024 (CLEAR)
OPSG_115_0904 – Agenda (CLEAR) OPSG_115_0904 - Meeting Headlines (CLEAR)
This meeting has been cancelled. The next Change Board meeting will take place on Wednesday 22 May 2024.
By subscribing you consent to receiving the SECAS newsletter.