Filename | 20210226-SMETS1-TMAD-S1SR-S1SPKI-Direction.zip |
Filesize | 3.13 MB |
Version | 1 |
Date added | 26 February 2021 |
Downloaded | 1002 times |
Tags | BEIS, designation |
Filename | 20210226-SMETS1-TMAD-S1SR-S1SPKI-Direction.zip |
Filesize | 3.13 MB |
Version | 1 |
Date added | 26 February 2021 |
Downloaded | 1002 times |
Tags | BEIS, designation |
This is the April 2024 SEC Modifications Working Group meeting, where we will be discussing: MP085B ‘Synchronisation of Smart Meter voltage measurement periods (meters currently installed)’ MP244 ‘Device Alerts
This is the April 2024 SEC Issues Group meeting, where we discussed: PPM continuity plan Please see the meeting summary here: SEC Issues Group Meeting Summary - April 2024 (CLEAR)
OPSG_115_0904 – Agenda (CLEAR) OPSG_115_0904 - Meeting Headlines (CLEAR)
This meeting has been cancelled. The next Change Board meeting will take place on Wednesday 22 May 2024.
By subscribing you consent to receiving the SECAS newsletter.